rafidainscope - The Iraqi Ministry of Transport announced the success of its technical and engineering staff in the locomotive unit in completing comprehensive maintenance on the German locomotive numbered (2547), marking a significant step toward rehabilitating the Iraqi Republic Railways
fleet. The Ministry emphasized that this achievement is part of a broader strategy aimed at maximizing resources and transforming the company's assets into active productive capacities. This directly contributes to raising operational efficiency, reducing operating costs, and increasing financial revenues.
The locomotive is scheduled to enter active service soon to support freight and passenger transport operations, forming a qualitative addition that strengthens the nation's railway sector capabilities.